References

Omega Mühendislik Project References

Mas Pompa San.A.Ş.

   Year: 2006
   Location: Düzce
   Area: 15.000 m2

   Works Performed:
  • 1.6 MVA, MV-LV Electrical Systems
  • Weak Current System Design and Complete Electrification